If flooding occurs, depots will respond and move fleets before water levels get too high.įlood prone route corridors will also receive extra monitoring.Įnsure bus windows, hatches and doors are closed.Īll depot parking areas and perimeters will be inspected for unsafe conditions.īus depots will have extra staff to assist in the event a bus is disabled.Īll road trucks will be equipped with chainsaws and any other debris equipment needed. ![]() Non-essential repair, maintenance and construction work is being evaluated for possible suspensions if the weather warrants.Īll depots will pay special attention for flash flooding. Crews will perform frequent signal switch tests to ensure all signals are functioning as intended and activate weather-related precautions as needed. All maintenance departments will be staffed sufficiently. Inspect and stage emergency trucks, pumping equipment, and emergency response equipment.Ĭontinue to monitor weather reports and assess any implications of storm conditions on high tides or storm surge.Ī Local Storm Desk will be activated if conditions warrant. Prepare, fuel and test equipment for debris clearance, if necessary. Inspect 30 drains at flood prone locations and ensure they are ready to accept water and not create any unsafe conditions. Prepare crews on debris trains for supporting clean-up activities. Stage crews to monitor and respond to flood-prone locations. Strategic deployment of maintenance personnel including track, signal and power staff. The regional train systems took the following precautions ahead of the storm: Harlem Line service between Wassaic and Southeast will resume with the 5:10 a.m. On the Waterbury Branch, where buses are currently substituting for trains because of track work, service will resume with the 5:38 a.m. Danbury-bound departure from South Norwalk. Danbury Branch service will resume with the 5:08 a.m. departure from New Canaan and the 6:53 a.m. New Canaan Branch service will resume with the 5:23 a.m. departure from Grand Central Terminal making all local stops to New Haven. Grand Central-bound local from Stamford, and the 5:30 a.m. Grand Central-bound train from New Haven Union Station, the 4:58 a.m. On Metro-North, New Haven Line service will resume with the 4:00 a.m. departure from Greenport and the 7:30 a.m. On LIRR's Ronkonkoma Branch, the first trains to operate between Ronkonkoma and Greenport will resume with the 5:25 a.m. In all other parts of LIRR and Metro-North systems that had been suspended on Sunday will resume with the first regularly scheduled trains after 4 a.m. train that runs on Mondays from early June through mid-October. ![]() ![]() departure from Montauk will operate on its normal schedule, as will the 7:28 a.m. On the LIRR's Montauk Branch, the first trains to operate east of Patchogue through to Montauk will depart Montauk at 1:00 a.m. and make all local stops to Speonk where it will run as a semi-express, stopping at Patchogue, Sayville, Bay Shore, and Babylon before running express to Jamaica for connecting trains to Penn Station and Atlantic Terminal, Brooklyn. The LIRR will also operate a train that will depart Montauk at 8:07 a.m. will instead originate at Montauk at 4:00 a.m., with stops at East Hampton at 4:22 a.m. The train that normally originates at Southampton at 4:41 a.m. To assist customers who may have had their travel plans affected by the storm, the LIRR is adding additional service on the Montauk Branch for Monday.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |